Any reasonably competent home handyman can install hardwood flooring on a roughed in wood floor base. The quality levels of todays manufacturing processes insure that adjoining slats or boards fit to create a level floor. Micro beveling of the board edges create splinter free slats.
However, in order to ensure you lay the perfect floor, it is important that certain items are taken care of:
- Windows Why check the windows if you are installing a floor? Good question! Check to make sure that the windows do not leak and that the drywall or plaster below the windows are in good shape. You dont want to be replacing drywall or plaster directly above a new hardwood floor. If you have window or wall problems fix them before you install the hardwood flooring.
- Painting If you are planning on painting the room paint it before you install the hardwood flooring, for two reasons. The first is that you dont want to get paint on the floor and the second is that you dont want to use a ladder on a new hardwood floor, it can leave foot marks.
- Baseboard: If there is existing baseboard and/or quarter-round they should be removed. Check for, and remove, any finishing nails that may have pulled through the baseboards and be left in the walls.
- Doorframe Trim: It is easier to remove doorframe trim molding and then reinstall it so that it sits on the hardwood floor. However, it is possible to undercut doorframe trim to allow for the placement of the hardwood under the trim.
- Doors Removing doors makes installation easier and allows for trimming the bottom of the doors to accept the increased thickness of the floor.
- Squeaks Check the sub-floor for any squeaks and repair by adding screws through the plywood or sub-floor material into the floor joists. It is important to note that the installation of the hardwood flooring will not correct or eliminate any squeaks in the sub-floor.
- Soft Spots Walk on the sub-floor and try to detect any soft spots. These are areas where the sub-floor sags when you walk on it. These areas should be corrected from below by adding extra support between the floor joists.
- Protruding Screws and Nails Any screw or nail heads that are not level or recessed into the floor must be corrected. Where chipboard is used as the sub-floor material, it is not uncommon for screw heads to raise pieces of the chipboard around the screw. These bubbles must be removed with a block plane, belt sander, or wood rasp.
- Sweep and Vacuum The floor must be free of all debris, and dirt. Dont forget to vacuum under between the plaster or drywall and the sub-floor. Often small pieces of plaster, nails and screws will wedge themselves in that area and for sure, they will end up under one of the flooring boards as you are attempting to nail it down.
- Acclimatize the Flooring: One of the biggest mistakes made when installing hardwood is not allowing the slats or boards to acclimatize to the home. Hardwood swells and shrinks with temperature and humidity. Hardwood should be acclimatized for a minimum of 48 hours, some manufacturers recommend 72 hours before installation. Follow the manufacturers instructions.
Planning is the key to a successful hardwood flooring installation.
Additional information on hardwood flooring.
Home improvement, remodel and landscaping information.
Home Remodeling Facts